ETCS Level 2 without signals in conjunction with ATO GoA 2 brings a significant hub in the train sequence with already available technology.
As part of the commissioning of the Stuttgart 21 railway project, DB Netz AG commissioned NEXTRAIL to examine the feasibility of using ETCS Level 2 on the main line of the Stuttgart S-Bahn. Here, for the first time, a condensed block division with ETCS was examined for local transport. The study focused in particular on the dimensioning of block spacing using track vacancy and the effect of increasing train density on radio traffic.
It was shown that tight block division at the platform using short track vacancy sections leads to increased capacity. The technical requirements for the ATO system were also further detailed for the first time for GoA 2 in the area of main railways.
The results showed that the use of ATO GoA 2 also makes it possible to operate trains automatically at short notice, which increases the operational quality and, in future, also the capacity of the lines.
Key areas of service
-
Technical project management
-
Processing of central work packages as part of an engineering community
-
Coordination of the working groups and partners involved