ETCS investigation of the Stuttgart S-Bahn main line

ETCS investigation of the Stuttgart S-Bahn main line DB Netz AG Stuttgart, October 2017 to December 2019 Special feature of the project ETCS Level 2 without signals in conjunction with ATO GoA 2 brings a significant hub in the train sequence with already available technology. ETCS investigation on the Stuttgart S-Bahn main line Feasibility of […]

TRAXIMIZER – 3D acquisition of railways

3D mapping of existing routes in Israel Israel Railways (ISR) / NAN from VIA Consulting & Development GmbH Israel, September 2018 to May 2022 Special feature of the project The planning and project planning processes are based on up-to-date and accurate infrastructure data. This reduces project risk. TRAXIMIZER – 3D acquisition of railways. For this […]

Risk management procedures in accordance with CSM-RA

Risk management procedures in accordance with CSM-RA CFL Luxembourg, April 2018 to September 2022 Special feature of the project First implementation of a CSM-RA for the construction of new ETCS interlockings. CFL plans to build new interlockings, including ETCS Level 1, and new types of trackside light signals with two light points. The planned measure […]